Demolition quoting

Demolition quoting software
— quote jobs in under two minutes.

Demolition pricing is driven by what comes down, what's in it, and what it costs to cart away — site area, material type, hazardous materials and tip fees swing the number hard, and removing a load-bearing wall is an engineered job, not a sledgehammer one. Tradewin prices full and partial house demolition, strip-outs, garage and shed removals, pool fills and wall removal against your real disposal and labour costs, then sends a professional quote from site. Save your regular jobs — internal strip-outs per square metre, non-structural wall removal per metre, shed demolition — as TradeWin Recipes™ so repeat quoting takes seconds.

Try it now — price any job

Your starter recipe

Switchboard enclosure

$
×
ea

Circuit breakers

$
×
ea

Main switch + RCD

$
×
ea

Cabling & consumables

$
×
lm

Labour

hrs @ $/hr

Data is not collected.

Your total cost$1,424

Demolition job types in Tradewin

Pre-loaded job types with benchmarks — plus the ability to add your own custom jobs.

Commercial DemolitionFull House DemolitionGarage DemolitionInternal Strip-OutLoad-Bearing Wall RemovalPartial House DemolitionPool DemolitionShed / Outbuilding DemolitionWall Removal (Non-Structural)

What drives the price of demolition work

The same job can vary widely. Tradewin prices against your real costs, so these factors are built in — not guessed.

Disposal & tip fees

Carting demolition waste and paying landfill or transfer-station charges is a major cost — mixed material and concrete price differently, and rates vary by council.

Hazardous materials

Asbestos and other hazardous materials in a house or strip-out demand licensed handling and disposal, lifting the price well above a clean demolition.

Structural vs non-structural

Removing a load-bearing wall brings engineering, beam and column work priced per metre, whereas a non-structural wall is mostly make-good and services rerouting.

Site access & reinstatement

Tight access slows machines and cartage, and retained works or site reinstatement on partial demolition and pool fills add scope a flat price won't cover.

Common demolition jobs and what moves the price

  • Full House Demolition

    Site area, material type, hazardous materials present, and tip fees cause wide variation.

  • Garage Demolition

    Enter garage footprint area. Structure type, slab removal, and site access affect the per-sqm rate.

  • Internal Strip-Out

    Fit-out complexity, hazardous materials, and separation requirements affect per-sqm pricing.

  • Load-Bearing Wall Removal

    Enter the length of wall to be removed. Engineering, beam size, and column requirements drive cost per lm.

  • Partial House Demolition

    Retained works, hazardous materials, and access to site drive major variation.

  • Pool Demolition

    Pool type, fill material, and level of site reinstatement drive major variation.

Why demolition contractors choose Tradewin

  • Price strip-outs, garage and shed demolition and wall removal on your real disposal and labour costs
  • Save common jobs — internal strip-outs, non-structural wall removal, shed demo — as Recipes
  • Snap the tip docket — AI reads disposal fees and tonnage straight into the job cost
  • Turn “how much to knock down the old garage?” website enquiries into a costed auto-quote draft
  • Build tip fees, spoil cartage and make-good allowances into every quote so nothing's missed
  • Push invoices straight to Xero as a draft — no re-keying

Get started free

No credit card. Enter your costs for a real job and send your first quote today.

Create free account

Quoting the job is half of it

Every demolition job you quote becomes a job you can run — booked into the diary, worked, varied on site, invoiced and paid, all on the one record.

  1. 1

    Enquiry

  2. 2

    Quote

  3. 3

    Booked

  4. 4

    On site

  5. 5

    Variation

  6. 6

    Invoice

  7. 7

    Paid

Frequently asked questions

Is Tradewin built for demolition contractors?+

Yes. Tradewin supports 9+ demolition job types including Commercial Demolition, Full House Demolition, Garage Demolition. You can also add custom job types for work that isn't in the list.

How fast can I quote a demolition job?+

Most tradies price and send a quote in under two minutes once costs are saved. Repeat jobs are faster — apply a TradeWin Recipe and the costs scale to the new job size automatically.

Can customers request quotes via SMS or my website?+

The website quote form works on the free plan and every paid plan. A dedicated inbound number is included with Business and Scale, or available through the separate number add-on on other plans. Either way, a saved Recipe can prepare a priced draft for you to review and send.

Does Tradewin connect to Xero?+

Yes. Once you issue an invoice you can push it straight to Xero as a draft — no double data entry.

Can Tradewin quote full house demolition and internal strip-outs?+

Yes — full and partial house demolition, internal strip-outs, garage, shed and pool demolition are all pre-loaded job types. Each is priced against your real disposal, cartage and labour costs, with hazardous-material handling factored where it applies.

Does it price load-bearing wall removal differently to a non-structural wall?+

Yes. Load-bearing wall removal is a separate job type priced per metre with engineering, beam and column requirements built in, while non-structural wall removal is costed on services rerouting and make-good — so neither is under- or over-quoted.

Ready to quote faster?

Start free — no credit card required.

Start quoting as a demolition contractor